From the circuit - Most

Autodrom Most has measured noise around the circuit, a study is to propose measures

The new owner of the Most circuit has commissioned a noise reduction study. Measurements on 4 November compared bikes with standard and modified exhausts.

Getting there

Autodrom Most seen from Hněvín hill: the grandstand, tower and paddock beyond a wooded slope
Photo: Stefan Kühn / CC0 / Wikimedia Commons (resized and cropped)
Published
November 9, 2026
Track news
From the circuit

Autodrom Most is preparing a study to show how noise around the circuit can be reduced. The operator announced it on 5 November 2026 and itself calls noise the subject of a long-running dispute. The first step was a measurement carried out on 4 November by specialists from EKOLA group. The announcement presents the study as a concrete step by the circuit's new owner.

What the operator announced

"We hear what people living next to the circuit expect, and we want the planned measures to bring real benefit to the area," says Roman Staněk, chairman of the board of RIQ Investments, which owns the circuit. He adds that the choice of solutions is to rest on expert assessment and concrete data.

The study is at the data collection stage. On Wednesday riders made repeated runs on motorcycles with standard and modified exhausts, and noise was recorded at several set points near the final corners and outside the circuit. The aim was to compare how individual machines and exhaust systems affect noise. EKOLA group will now evaluate the data and propose measures. Choosing them and preparing their implementation is up to the circuit's management.

What it means for the amateur driver

For now nothing changes. The operator still sells 25-minute drives in your own car: the next dates in its online shop are on 18 November 2026 from 10:00, for CZK 1,500, with a helmet required. A motorcycle must have a standard silencer or an effective exhaust insert and meet the noise limits in the circuit's rules; a ride costs CZK 1,100.

What we do not know

The operator has not said which measures it is considering, when the study will be ready, or whether they will affect customer drives, exhausts or the circuit's opening hours. We are watching for the results and for the 2027 calendar of drives.

More about this circuit